Aerial view of a utility scale battery energy storage site at dusk, with rows of battery enclosures, a substation and transmission pylons beyond. Illustrative visualisation.

Utility scale BESS

Large grid connected storage projects combine infrastructure scale with trading complexity. Their leaders need to be comfortable with both.

Illustrative visualisation

The leadership challenges we see

Scale changes the risk profile

Projects of hundreds of megawatts bring transmission connections, larger procurement packages and financing that depends on the credibility of the team as much as the asset.

Duration is increasing

Modo Energy reported the average duration of the GB fleet rising to 1.65 hours in mid 2026. Longer duration systems change revenue strategy, warranty structures and the commercial skills owners need.

Connection positions are scarce

Following connections reform, a protected or Gate 2 connection is often the most valuable thing a project owns, and must be managed actively for years.

Utility scale projects reward leaders who think about operation from the first day of development. Decisions on layout, duration, supplier and connection shape revenues for fifteen years or more.

Roles we are asked to fill

  • Project Director
  • Head of Grid and Connections
  • Delivery Director
  • Commercial and Trading Director
  • Head of Asset Management

Talk to us about utility scale bess

Tell us about the business and the leadership question in front of you.

  1. A personal reply within one working day.
  2. A first conversation to understand the business and the timing.
  3. A written proposal with scope, approach and terms.

Or email hello@storiqpartners.com

Please do not include confidential candidate information.