Great Britain operational battery fleet against the 2030 requirement

Observed data
0102030402030 requirement 23 to 27 GWDec 2024: 4.5 GW4.5Dec 2024Q1 2026: 7.2 GW7.2Q1 2026Q2 2026: 7.6 GW7.6Q2 2026

Sources: ESS News on the Clean Power 2030 Action Plan (4.5 GW, Dec 2024); Modo Energy Q1 2026; Modo Energy Q2 2026; DESNZ Clean Power 2030 Action Plan.

View data
December 20244.5 GW
Q1 20267.2 GW
Q2 20267.6 GW
2030 requirement23 to 27 GW
Methodology

Operational capacity figures are as reported by each source at the date shown. The shaded band is the 2030 battery capacity range in the Clean Power 2030 Action Plan, a policy requirement rather than a forecast.

European battery storage installed per year

Observed data
0501001502002025 installed: 36 GWh362025 installed2026 forecast: 50 GWh502026 forecast2030 forecast: 138 GWh1382030 forecast

Source: SolarPower Europe, European Market Outlook for Battery Storage 2026 to 2030 (23 June 2026).

View data
2025 installed36 GWh
2026 forecastmore than 50 GWh
2030 forecast138 GWh
Methodology

The 2025 figure is reported installation, up 48 per cent on 2024, taking Europe's operational fleet past 100 GWh. 2026 is stated as expected to exceed 50 GWh and 2030 as 138 GWh; both are SolarPower Europe forecasts, shown as lighter bars.

Battery storage outcome of GB connections reform

Observed data
050100150200Gate 2 before 2030: 33 GW33Gate 2 before 2030Gate 2 2030 to 2035: 50 GW50Gate 2 2030 to 2035Not prioritised: 153 GW153Not prioritised

Source: Energy Storage News, 9 December 2025.

View data
Gate 2, before 203033 GW
Gate 2, 2030 to 2035 (derived)50 GW
Not prioritised153 GW
Methodology

83 GW of battery storage received Gate 2 offers, of which 33 GW connect before 2030; the 50 GW shown for 2030 to 2035 is derived by subtraction. 153 GW received Gate 1 offers or left the queue.

Tracked project capacity by stage

Derived estimate
Announced: 6462 MWhAnnounced6462Planning: 4000 MWhPlanning4000Permitted: 2408 MWhPermitted2408Financing: 2900 MWhFinancing2900Construction: 4489 MWhConstruction4489Commissioning: 0 MWhCommissioning0Operational: 1451 MWhOperational1451

Source: Global BESS Project Radar, 27 published projects, each linked to its own source.

View data
Announced6,462 MWh (5 projects)
Planning4,000 MWh (1 projects)
Permitted2,408 MWh (4 projects)
Financing2,900 MWh (3 projects)
Construction4,489 MWh (7 projects)
Commissioning0 MWh (0 projects)
Operational1,451 MWh (7 projects)
Methodology

Sum of stated MWh for projects in the Radar at each stage. The Radar is a curated sample of publicly announced projects, not a census of the market.

Geographic hiring hotspots

STORIQ analysis
United Kingdom: 3057 MWhUnited Kingdom3057Australia: 1600 MWhAustralia1600Italy: 1343 MWhItaly1343Japan: 589 MWhJapan589United States: 500 MWhUnited States500Poland: 300 MWhPoland300

Derived from the Project Radar.

View data
United Kingdom3,057 MWh
Australia1,600 MWh
Italy1,343 MWh
Japan589 MWh
United States500 MWh
Poland300 MWh
Methodology

Countries ranked by tracked MWh at the financing, construction and commissioning stages, where delivery hiring is most concentrated. This indicates where near term demand for delivery teams is likely, not where vacancies exist.

Potential workforce demand by role

STORIQ analysis
Grid Connection Specialist: 12 projectsGrid Connection Specialist12Project Director: 11 projectsProject Director11Construction Manager: 7 projectsConstruction Manager7HV Electrical Engineer: 7 projectsHV Electrical Engineer7Commissioning Manager: 7 projectsCommissioning Manager7HSE Manager: 7 projectsHSE Manager7Head of Asset Management: 7 projectsHead of Asset Management7Trading and Optimisation Manager: 7 projectsTrading and Optimisation Manager7O&M Manager: 7 projectsO&M Manager7Performance Analyst: 7 projectsPerformance Analyst7

Derived from the Project Radar and STORIQ stage role mapping.

View data
Grid Connection Specialist12 projects
Project Director11 projects
Construction Manager7 projects
HV Electrical Engineer7 projects
Commissioning Manager7 projects
HSE Manager7 projects
Head of Asset Management7 projects
Trading and Optimisation Manager7 projects
O&M Manager7 projects
Performance Analyst7 projects
Development Director5 projects
Head of Grid Connections5 projects
Land and Planning Manager5 projects
Project Developer5 projects
Procurement Lead4 projects
Project Finance Manager4 projects
Chief Financial Officer3 projects
Project Finance Director3 projects
Commercial Director3 projects
Owner's Engineer3 projects
Planning Manager1 projects
Community Engagement Lead1 projects
Environmental Lead1 projects
Methodology

For each tracked project we apply the roles typically needed at its current stage, then count how many projects imply each role. A measure of where demand pressure is likely, not a count of vacancies.

Recruitment activity by discipline

Observed data

We publish this module once our curated opportunities feed holds enough attributed roles to be meaningful. See current opportunities.

Methodology

Counts of currently published opportunities by discipline, combining STORIQ assignments and publicly advertised roles we have curated with attribution.

BESS salary benchmarks

Observed data

We only publish salary benchmarks we can source and date. None are published yet. For a confidential, evidence based view, use the market value tool or ask us below.

Methodology

Benchmarks are entered only from cited published surveys or official statistics, with the source, date and basis shown. We do not publish AI estimates as salary data.

Critical and emerging skills

STORIQ analysis
Methodology

STORIQ's assessment of skills in short supply or rising demand, with links to recent verified industry developments that illustrate each point. Evidence links update automatically as new stories are classified.

Request a BESS Talent Intelligence Report

A tailored briefing on the talent market for your project, portfolio or market entry: roles in demand, where experience sits and what it will take to hire.

Please do not include confidential candidate information.